Saipem – Earth Movement and Embanking civil works
Project Description:
Earth Movement and Embanking civil works to a five-kilometer length of OSBL Water Pipelines:Soil clearance of vegetation, grubbing, surface stripping, excavation, disposal, subgrade preparation and proof rolling, Top soil removal from ground level, Earth moving (general grading and backfilling), Formation of berm to be developed by structural filling, Soil improvement using geotextile fabric, Supply fill material from borrow pits and structural filling to required grade elevation, Supply and installation of flume pipe culvert, Dredging.
Client:
Saipem
Duration:
June 2013 – September 2015
Location:
West Qurna 1, Iraq